| Drawworks |
IDECO 725 E - 750 hp |
Depth Capacity |
10,000' (1-1/8" Line) |
Prime Movers |
2-CAT D398; 800 kW Generator; IPS SCR |
Mast |
DRECO (Rated at 340,000 Lbs on 8 lines) |
Substructure |
DRECO (Height GL to Rotary Beam = 12' 6") |
Block/Hook Load |
IDECO 160 Ton |
Swivel |
IDECO 200 Ton |
Rotary Table |
IDECO 20.5" |
Mud Pumps |
2 ea NATIONAL 8-P-80, 800 hp each |
Mud System |
600 Bbl Total |
Shale Shaker |
1 - SWACO Mongoose |
Solids Control |
Single Cone - Desander; 8 Cone - Desilter |
BOP Equipment |
11"-5000 psi Pipe/Blind; 11" 5,000# Annular |
Accumulator |
KOOMEY - 5 station with 10 bottles (12 gallon each) |
Choke Manifold |
4" x 3" (5000 psi) |
Fuel/Water Tanks |
Fuel - 9000 gals; Water - 400 Bbls |
Boiler |
Yes |
Drill Pipe |
4-1/2" Grade G |
Drill Collars |
6-1/4" |
** |
Rigged up for Self Skidding Rail System |